International Residential Code Guidelines

The following guidelines reflects the 2018 edition of the International Residential Code. NOTE: This document is not intended to include all the code regulations and changes in the 2018 IRC. This list is provided to give you a list of the items normally checked by building inspector; it is not all-inclusive. Please use this list only as a guide; it does not replace the codes. It is the responsibility of the licensed contractors, owner builders and the subcontractors to insure that their work is in full compliance with all applicable codes and ordinances.

Inspection Procedure

The following sequence of inspections is enforced by municipalities served. It is the responsibility of the contractor to request an inspection. We request at least a 24 hour notice for inspections. Please have your permit number, 9-1-1 Street Address and type of inspection when calling for an inspection. It is the responsibility of the contractor to provide access and means for inspections. Work should not be done beyond the point indicated in each successive inspection unless approved by the Building Inspector or Building Official. No building shall be occupied until all inspections have been completed and approved and a certificate of occupancy has been issued.

  1. Footing Inspection: When the footing/foundation is complete, call to schedule an inspection before concrete is poured. Click here for more details regarding footing inspection.
  2. Under Slab Inspection: Plumbing test should be on the fittings exposed. This inspection can be done in conjunction with the footing inspection, but you must request it when scheduling your footer inspection. Call before pour so under slab inspections can be performed. Click here for more details regarding under slab inspection.
  3. Foundation Inspection: Click here for more details regarding the foundation inspection.
  4. Energy Inspection: Click here for more details regarding the energy inspection.
  5. Wallboard and Wall Covering Inspection: Click here for more details regarding the wallboard and wall covering inspection.
  6. Rough-In Inspection: This inspection is made prior to the installation of insulation or sheetrock. The house is dried-in, framing, HVAC, plumbing and electrical should be roughed-in at this time. Click here for a Rough-In Inspection Guidelines.
  7. Final Inspection: This inspection occurs prior to occupancy. The building is complete at this stage with all code issues addressed. If you have an emergency and need this C of O on the same date, please let your inspector know. Click here for more details regarding this inspection.

Offices & Contact Info

  • Paul Buchhofer, Vice President
    302 E. Pennsylvania Blvd
    Feasterville, PA 19053
    800-352-3457 fax: 215-364-7921
    Office Manager: Colleen Martin
    Email: cmartin@biuinc.com

  • John Hudak, President
    Joseph Supulski, Regional Manager
    1010 Albright Ave
    Scranton, PA 18508
    866-344-9681 fax: 570-969-9700
    Office Manager: Amanda Pettinato
    Email: apettinato@biuinc.com

  • Ed Cardy, Vice President
    William White, Regional Manager
    1805 West 38th Ave
    Erie, PA 16508
    877-272-0255 fax: 814-860-8048

  • Mark Stanton, Regional Manager
    343 Eicher Street
    Pittsburgh, PA. 15237
    800.922.6062 Fax: 412-766-2711
    Office Manager: Jenn Haskins
    Email: jhaskins@biuinc.com

  • Mike Gensemer, Regional Manager
    25 East McClure Street
    New Bloomfield, PA 17068
    877-453-4321 fax: 717-582-4431
    Krista Weibley – Officer Manager
    Email: kweibley@biuinc.com

  • Mark Stanton, Regional Manager
    825 C Western Ave
    Jeanette, PA 15644
    724-523-5940 fax: 724-523-5942

  • Kyle Bendler, Regional Manager
    Liberty Plaza, Suite 1-C
    Newark, DE 19711
    800-732-2551 fax: 302-737-1752
    Office Manager: Claire Layton
    Email: clayton@biuinc.com